Major Home Renovations · Los Angeles

Rethink the Home You Already Have.

One Home. One Coordinated Renovation.

A major renovation can change much more than individual rooms. It can change how the entire home functions, flows and feels.

Accelerate Construction manages substantial whole-home and multi-room renovations throughout Los Angeles, coordinating structural work, building systems, kitchens, bathrooms and finishes as one connected construction project.

Renovated Malibu beachfront home by Accelerate Construction seen from the sand: wood siding, glass-rail decks and a deep roof overhang above the original pilingsMajor Renovation · Malibu
What Makes a Renovation Major?

More Than Remodeling One Room.

A major home renovation doesn’t necessarily mean changing every room in the house. It means the scope is substantial enough that the different parts of the project need to be considered together.

That may mean renovating most of the home, remodeling several connected areas at the same time, changing the floor plan, making structural modifications, modernizing building systems or combining several of these into one project.

Whole-Home Renovation

Updating and rebuilding substantial portions of an existing residence as one coordinated project.

Multi-Room Renovation

Renovating several areas together so layouts, systems, materials and finishes can be planned as a whole.

Layout & Structural Changes

Opening rooms, relocating walls or making structural changes that reshape how the home functions.

Modernization

Updating older homes where electrical, plumbing, lighting, HVAC, windows, doors or other systems are part of the larger renovation.

A major renovation is the opportunity to rethink how the home works as a whole—not simply remodel several rooms at the same time.

Starting With the Existing Home

The Existing Home Is the Starting Point.

Unlike new construction, a major renovation begins with a structure that already exists. Before deciding how to build the new work, we need to understand the home we’re working with.

We look at the existing layout, structure, building systems and the areas the client wants to change. From there, we can help determine how the different parts of the renovation should work together.

The existing kitchen and dining room of a West Hollywood home before its renovation, with arched openings and the original cabinetryThe Existing Home · West Hollywood

Existing Layout

What works, what doesn’t and how the spaces currently connect.

Structure

Walls, framing and structural conditions that may affect the proposed changes.

Building Systems

Existing plumbing, electrical and HVAC systems that may need to be modified or coordinated with the renovation.

Client Priorities

How the homeowner wants the house to function when the renovation is complete.

The renovated West Hollywood kitchen: gray raised-panel cabinetry, marble counters and a marble island with a gas cooktop, opening to the rooms beyondKitchen, Dining & Living Joined · West Hollywood
Rethinking the Layout

Changing How the Home Works.

Some major renovations keep much of the existing floor plan. Others fundamentally change it. Rooms may be opened to one another, walls may move, circulation can change and spaces that no longer work for the homeowner can be reconsidered.

The goal isn’t simply to create a more open house. The goal is to create a layout that works better for the people living there.

  • Opening a kitchen to adjacent living or dining areas
  • Reconfiguring bedroom or bathroom layouts
  • Creating larger primary suites
  • Improving circulation between rooms
  • Reworking entrances, hallways or transitional spaces
  • Connecting interior spaces more effectively to exterior areas
Structural Changes

When the Renovation Changes the Structure.

Removing or relocating walls can affect much more than the room where the work takes place. When structural changes are part of the renovation, the new design has to work with the way the existing house carries its loads.

Where engineering is required, structural changes are coordinated with the appropriate plans and engineering before the work is performed.

  • Removing or modifying load-bearing walls
  • Installing beams and posts
  • Creating larger openings between rooms
  • Modifying framing
  • Reconfiguring stairs or openings where applicable
  • Structural work associated with major layout changes
Anticipating Existing Conditions

Experience Before the Walls Are Opened.

In a major renovation, some existing conditions cannot be fully confirmed until construction begins. But that doesn’t mean every condition should come as a surprise.

Years of working on Los Angeles homes help us recognize what is likely to be behind the finishes and take those conditions into consideration when planning the project.

Once the house is opened, we verify the existing construction and address what is actually there before the new work covers it again.

Experience doesn’t eliminate every unknown. It helps us anticipate what we’re likely to encounter and plan the project accordingly.

A hallway ceiling opened during a renovation, exposing the joists, electrical wiring, new recessed lights and insulated ductworkBehind the Finishes
One Renovation, Many Connected Systems

Planning the Home as One Project.

A major renovation often involves multiple trades working throughout the same home—structural work, plumbing, electrical, HVAC, cabinetry, tile, flooring, drywall, painting and finish work—and all of it has to happen in the right sequence.

When several areas of a home are going to change, planning them together creates opportunities that aren’t available when each room is treated as a separate project. Structural work can be completed before new finishes are installed. Plumbing, electrical and HVAC can be coordinated across multiple areas before the walls and ceilings are closed. Flooring can transition consistently through the home, and lighting, cabinetry, doors, trim and finishes can be considered together.

Most importantly, completed work doesn’t have to be unnecessarily disturbed later because another part of the renovation wasn’t considered earlier—and the finished home feels consistent rather than assembled one project at a time.

The objective is not simply to complete several remodeling projects at once. It is to make the different parts of the renovation work together.

Crew working on the new floor framing of the Malibu home during its renovation, with the ocean beyondFraming in Progress · Malibu

Plumbing

New fixture locations, kitchens, bathrooms and existing systems need to be coordinated before walls and floors are closed.

Electrical & Lighting

Outlets, switches, recessed lighting, dedicated circuits and other electrical work can be planned throughout the renovation instead of room by room.

HVAC

Existing heating and cooling systems can be evaluated when layout changes or new room configurations affect distribution.

Framing & Structure

Structural work needs to happen in coordination with the mechanical systems and the spaces being created.

The renovated Wrightwood home among the pines, re-clad in dark board-and-batten siding with an orange front door
Whole-House Renovation · Wrightwood
Kitchens, Bathrooms & Interior Finishes

The Spaces You See Every Day.

Major renovations often include the rooms and finishes that homeowners interact with every day—kitchens, bathrooms, flooring, cabinetry, lighting, doors, trim and paint.

Because these elements are part of a larger renovation, decisions can be coordinated throughout the home rather than made independently from room to room.

  • Custom cabinetry
  • Countertops and backsplashes
  • Bathroom tile and custom shower work
  • Flooring
  • Interior doors and trim
  • Lighting
  • Paint and finishes
  • Windows and exterior doors where part of the renovation
For a closer look at those rooms on their own:Kitchen RemodelingBathroom Remodeling
Finished kitchen of the West Hollywood renovation with gray raised-panel cabinetry and a marble island
Kitchen · West Hollywood
New bathroom of the Wrightwood renovation with a dark-tiled shower behind an orange-framed glass door
Bathroom · Wrightwood
New wood stairs and flooring inside the renovated Malibu home
Stairs & Flooring · Malibu
Two Starting Points

You Don’t Need to Have Everything Figured Out Before Calling Us.

01

Starting With an Idea?

Many major renovation clients come to us before architectural or engineering plans have been completed. We can meet at the property, discuss what the client wants to change, review the existing home and help establish the anticipated construction scope.

If plans or engineering are required and the client does not already have their own design team, they have the option of working with an architect we work with so the design and construction sides of the project can be coordinated from the early stages.

02

Already Have Plans?

If architectural or engineering plans have already been prepared, we can review them from a construction perspective, discuss the scope and prepare for the transition from the plans to work in the field.

Pricing Before Completed Plans

Understanding the Project Before Everything Is on Paper.

A completed set of plans is not always required for us to begin discussing construction pricing for a major renovation.

When a client comes to us before plans have been prepared, we meet with them to understand what they want to change, review the existing home and gather the information needed to define the anticipated scope of work.

Based on that information, we can discuss construction pricing so the client can determine whether the project is within the budget they have in mind before moving forward with the plans.

If the client decides to proceed with Accelerate Construction, the agreement can include both the preparation and coordination of required plans and the construction work, allowing the project to move from the initial concept through construction with one coordinated team.

The Process

How a Major Home Renovation Comes Together.

Phase 1

Planning

  1. 01

    Consultation & Existing Home Review

    Meet with the homeowner, understand the goals and review the existing property.

  2. 02

    Scope & Layout Development

    Determine what is changing and how the different parts of the renovation connect.

  3. 03

    Plans & Engineering When Required

    Coordinate architectural plans, structural engineering and other required technical information.

  4. 04

    Construction Pricing

    Establish the construction scope and pricing based on the information available at that stage.

  5. 05

    Permits & Preconstruction

    Coordinate required permitting related to our construction scope and prepare the project for work in the field.

Phase 2

Construction

Selective demolition of a two-story stucco home, its exterior walls opened to the original framing and lath
01 · Selective Demolition
An existing kitchen before its renovation: white cabinetry with glass-front uppers, wood countertops, a farmhouse sink and a dark tile floor
02 · Existing Conditions
New engineered beams and posts installed in the opened Santa Monica home, with new sheathing on the walls beside them
03 · Structure & Framing
Insulation in the walls and ceiling of a framed room with new windows, and drywall stacked on the floor ready to close the walls
04 · Before the Walls Close
Insulation in the ceiling and drywall being installed inside the Malibu home
05 · Insulation & Drywall
A kitchen nearing completion: gray shaker cabinetry, white quartz counters with a waterfall edge, a farmhouse sink, a patterned tile backsplash, brass pendants and hardwood floors
06 · Finishes
  1. 06

    Preparation & Selective Demolition

    Protect areas that remain and open the portions of the home necessary for the renovation.

  2. 07

    Existing Condition Verification

    Verify the construction that has been exposed and address necessary existing conditions before covering them again.

  3. 08

    Structural & Framing Work

    Complete required structural modifications and framing.

  4. 09

    Rough Plumbing, Electrical & HVAC

    Coordinate the building systems before walls and ceilings are closed.

  5. 10

    Insulation & Drywall

    Complete required insulation, drywall and wall preparation.

  6. 11

    Kitchens, Bathrooms & Interior Finishes

    Cabinetry, tile, countertops, flooring, doors, trim, fixtures and related finish work.

  7. 12

    Painting & Final Details

    Complete painting, finish installations and remaining construction details.

Phase 3

Completion

  1. 13

    Punch & Quality Review

    Review the completed work and address remaining details.

  2. 14

    Final Inspections

    Coordinate applicable final inspections for permitted work.

  3. 15

    Final Walkthrough

    Walk through the completed renovation with the homeowner.

Principal-Led Construction

Personally Supervised From Start to Finish.

At Accelerate Construction, a major renovation isn’t handed from a salesperson to a project manager after the agreement is signed.

Alon remains directly involved throughout the project—from the early discussions and construction planning through the work in the field, inspections and final details.

Alon Damari, owner of Accelerate Construction, in front of a completed home in Los Angeles

Direct Communication

The client communicates directly with the person responsible for the construction.

Jobsite Supervision

Alon regularly reviews the work being performed and the details that affect the finished project.

Trade Coordination

The different trades are coordinated in the sequence required for the renovation.

Inspections

For permitted work, Accelerate Construction coordinates required inspections, and Alon personally meets with the inspector.

Rotted roof-edge framing and sheathing exposed beneath a clay-tile roof once the finishes were removedConcealed Deterioration Exposed
The Work Behind the Finish

What You Don’t See Matters.

Once the finishes are in, the work that determines how the renovation performs is no longer visible. It has to be right before it is covered.

Behind the Walls

Framing, blocking and concealed construction need to be correct before the finishes cover them.

Waterproofing

Wet areas and exterior transitions require the proper preparation before tile or finish materials are installed.

Rough Systems

Plumbing, electrical and HVAC work need to be coordinated before drywall closes the walls.

Transitions

Where new construction meets existing construction, alignment, levels and finish transitions affect how the completed renovation feels.

Approvals

Permits & Inspections.

Major renovations can involve structural, electrical, plumbing, mechanical and other work that requires permits and inspections. The exact requirements depend on the scope of the project.

Accelerate Construction coordinates permitting related to our construction scope, schedules required inspections and works through the inspection process as construction progresses.

Alon personally meets with the inspector for the required project inspections.

Our Standard at Completion

The work isn’t finished simply because it’s completed. It needs to be completed properly and to a level of workmanship we’re comfortable putting the Accelerate Construction name on.

One Home. One Coordinated Renovation.

When a renovation affects substantial parts of a home, the individual pieces shouldn’t be planned independently. Structure, building systems, layouts and finishes all need to come together as one project.

Accelerate Construction manages that process from early planning through completion, with direct personal involvement throughout.

Planning a Major Renovation?

Whether you already have plans or are starting with an idea, we can discuss the existing home, what you want to change and the next steps toward plans, permits and construction.

Scope

CSLB License #864438 · Bonded · Insured

Direct Line
818.348.4840
Email Our Office
Debra@AccelerateConstructionInc.com
Email Alon
Alon@AccelerateConstructionInc.com
Office
5348 Overing Drive, Woodland Hills, CA 91367
Hours
Mon–Fri · 7:00 AM – 6:00 PM
Woodland Hills HQ